Revision: 23, The layout has revise to R-23, due to adding LPG bulk tank and a location a area for future espension for other plating system upgrade, for detail please refer to below mention

1. Additional a LPG bulk tank at the conner of the factory area
2. Re location of Reverse Osmosis system to near oven area
3. Re location of waste water treatment to Reeverse Osmosis area
4. Modify the road to "R4320" as the dimesion, in order to let all trailer easy passing though and smooth exit during any emergency occur...